Skip to main content
The project timezone affects automated backups. The project timezone doesn’t affect: To change the timezone for a project, follow these steps:
  1. Open the project where you want to change the timezone.
  2. Click Settings.
  3. Select the timezone from the list.
  4. Click Save.
Last modified on March 10, 2026